CCR RULE COMPLIANCE DATA AND INFORMATION

 
 

CCR RULE COMPLIANCE DATA AND INFORMATION

for Brayton Point Power Station

Documentation made available by Brayton Point LLC

 

 

 

2019

 

2019 Annual Groundwater Monitoring and Corrective Action Report and Final Closure Report — Brayton Point CCR Basins A, B, and C

Date: September 18, 2019

» Download Document

 


Closure Notification Memo

Date: September 18, 2019

» Download Document

 


2018 Annual Groundwater Monitoring and Corrective Action Report – Brayton Point CCR Basins A, B, and C 

Date: January 31, 2019

» Download Document

 


 

2018 Annual Groundwater Monitoring and Corrective Action Report – Brayton Point CCR Basins A, B, and C 

Date: January 31, 2019

» Download Document

 


 

 

2018

 

Assessment Monitoring Program Establishment Notification – Ash Basins A, B, and C 

Date: September 5, 2018

» Download Document

 


 

Notification of Ash Basins A, B and C Closure Progress Report

Date: July 31, 2018

» Download Document

 


 

Alternative Source Demonstration Brayton Point Power Station

Date: April 11, 2018

» Download Document

 


 

2017 Annual Groundwater Monitoring and Corrective Action Report

Date: January 31, 2018

» Download Document

 


 

 

2017

 

2017 10 Brayton Point Ash Basin A CCR NOI for Closure

Date: October 13, 2017

» Download Document

 


 

2017 10 Brayton Point Ash Basin C CCR NOI for Closure

Date: October 13, 2017

» Download Document

 


 

2017 06 Brayton Point CCR NOI for Ash Basin B Closure

Date: June 30, 2017

» Download Document

 


 

2017 10 17 Brayton Point CCR Ash Basin A, Ash Basin B, Ash Basin C Statistical Plan Certification

Date: November 7, 2017

» Download Document

 


 

2017 10 17 Brayton Point CCR Monitoring System Certification Letter

Date: November 7, 2017

» Download Document

 


 

2017 Brayton Point CCR Closure Plan Ash Basin A

Date: November 27, 2017

» Download Document

 


 

2017 Brayton Point CCR Closure Plan Ash Basin B

Date: November 27, 2017

» Download Document

 


 

2017 Brayton Point CCR Closure Plan Ash Basin C

Date: November 27, 2017

» Download Document

 


 

2016

 

2016 Brayton Point CCR Fugitive Dust Control Annual Report

Date: December 8, 2016

» Download Document

 


 

Ash Basin A Closure Plan

Date: November 10, 2016

» Download Document

 


 

Ash Basin A Inflow Design and Flood Control System Plan

Date: November 10, 2016

» Download Document

 


 

Ash Basin A Liner Evaluation

Date: November 10, 2016

» Download Document

 


 

Ash Basin A Safety Factor Assessment

Date: November 10, 2016

» Download Document

 


 

Ash Basin A Structural Stability Assessment 

Date: November 10, 2016

» Download Document

 


 

Ash Basin B Closure Plan

Date: November 10, 2016

» Download Document

 


 

Ash Basin B Inflow Design and Flood Control System Plan

Date: November 10, 2016

» Download Document

 


 

Ash Basin B Liner Evaluation

Date: November 10, 2016

» Download Document

 


 

Ash Basin B Safety Factor Assessment

Date: November 10, 2016

» Download Document

 


 

Ash Basin B Structural Stability Assessment

Date: November 10, 2016

» Download Document

 


 

Ash Basin C Closure Plan

Date: November 10, 2016

» Download Document

 


 

Ash Basin C Inflow Design and Flood Control System Plan

Date: November 10, 2016

» Download Document

 


 

Ash Basin C Liner Evaluation

Date: November 10, 2016

» Download Document

 


 

Ash Basin C Structural Stability Assessment

Date: November 10, 2016

» Download Document

 


Brayton Point CCR Notice of Availability

Date: November 14, 2016

» Download Document

 


 

2015

 

Brayton Point Power Station CCR Fugitive Dust Control Plan

Date: November 17, 2015

» Download Document