CCR RULE COMPLIANCE DATA AND INFORMATION
for Brayton Point Power Station
Documentation made available by Brayton Point LLC
Documentation made available by Brayton Point LLC
2019 Annual Groundwater Monitoring and Corrective Action Report and Final Closure Report — Brayton Point CCR Basins A, B, and C
Date: September 18, 2019
2018 Annual Groundwater Monitoring and Corrective Action Report – Brayton Point CCR Basins A, B, and C
Date: January 31, 2019
2018 Annual Groundwater Monitoring and Corrective Action Report – Brayton Point CCR Basins A, B, and C
Date: January 31, 2019
Assessment Monitoring Program Establishment Notification – Ash Basins A, B, and C
Date: September 5, 2018
Notification of Ash Basins A, B and C Closure Progress Report
Date: July 31, 2018
Alternative Source Demonstration Brayton Point Power Station
Date: April 11, 2018
2017 Annual Groundwater Monitoring and Corrective Action Report
Date: January 31, 2018
2017 10 Brayton Point Ash Basin A CCR NOI for Closure
Date: October 13, 2017
2017 10 Brayton Point Ash Basin C CCR NOI for Closure
Date: October 13, 2017
2017 06 Brayton Point CCR NOI for Ash Basin B Closure
Date: June 30, 2017
2017 10 17 Brayton Point CCR Ash Basin A, Ash Basin B, Ash Basin C Statistical Plan Certification
Date: November 7, 2017
2017 10 17 Brayton Point CCR Monitoring System Certification Letter
Date: November 7, 2017
2017 Brayton Point CCR Closure Plan Ash Basin A
Date: November 27, 2017
2017 Brayton Point CCR Closure Plan Ash Basin B
Date: November 27, 2017
2017 Brayton Point CCR Closure Plan Ash Basin C
Date: November 27, 2017
2016 Brayton Point CCR Fugitive Dust Control Annual Report
Date: December 8, 2016
Ash Basin A Closure Plan
Date: November 10, 2016
Ash Basin A Inflow Design and Flood Control System Plan
Date: November 10, 2016
Ash Basin A Liner Evaluation
Date: November 10, 2016
Ash Basin A Safety Factor Assessment
Date: November 10, 2016
Ash Basin A Structural Stability Assessment
Date: November 10, 2016
Ash Basin B Closure Plan
Date: November 10, 2016
Ash Basin B Inflow Design and Flood Control System Plan
Date: November 10, 2016
Ash Basin B Liner Evaluation
Date: November 10, 2016
Ash Basin B Safety Factor Assessment
Date: November 10, 2016
Ash Basin B Structural Stability Assessment
Date: November 10, 2016
Ash Basin C Closure Plan
Date: November 10, 2016
Ash Basin C Inflow Design and Flood Control System Plan
Date: November 10, 2016
Ash Basin C Liner Evaluation
Date: November 10, 2016
Ash Basin C Structural Stability Assessment
Date: November 10, 2016
Brayton Point CCR Notice of Availability
Date: November 14, 2016
Brayton Point Power Station CCR Fugitive Dust Control Plan
Date: November 17, 2015